Electra DELTA 21ST Manual de Instalação Página 3

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 2
INSTALLATION INSTRUCTIONS
WARNING
When using electrical products, basic precautions should
always be followed, including the following:
1. DANGER: RISK OF ELECTRIC SHOCK. Connect only to a
circuit protected by a Ground Fault Circuit Interrupter.
2. Grounding is required. The unit should be installed and
grounded by a qualified service representative.
3. Install to permit access for servicing.
SAVE THESE INSTRUCTIONS
IMPORTANT: Follow the instructions below EXACTLY
and IN THE ORDER LISTED. Once installed, your UV
unit will provide years of successful operation.
TABLE OF CONTENTS
0.0 Forward
1.0 Introduction
2.0 Pre-Installation
2.1 Pond Turnover Rates
2.2 Swimming Pool Turnover Rates
3.0 Desired Flow Rate Chart – Ponds
4.0 Desired Flow Rate Chart – Swimming Pools, Fountains, Water Features
5.0 Installation
5.1 Locating The UV Unit
5.2 Plumbing The UV Unit – Plumbing Diagram and Bypass Diagram
5.3 Installing Inlet/Outlet Unions
5.4 Installing Pressure Gauge
5.5 Mounting The UV Unit On A Solid Base
5.6 Gluing Piping To The UV Unit
5.7 Electrical Connection
5.8 Electrical Bonding (Grounding)
5.9 Safety Pressure Switch
6.0 Start-up
6.1 Pump Start-up
6.2 Leak Check Total System
6.3 Swimming Pool Chemical Balance
7.0 Maintenance – Quartz Tube Removal
7.1 Disconnect Power
7.2 Stop Circulation Pump
7.3 Remove Electrical Bonnet
7.4 Remove UV Bulb
7.5 Remove Bulb Holder Acorn Nut
7.6 Remove Quartz Tube
7.7 Cleaning Quartz Tube
3
Vista de página 2
1 2 3 4 5 6 7 8 ... 19 20

Comentários a estes Manuais

Sem comentários