Electra DELTA 21ST Manual de Instalação Página 7

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 6
5.3 Installing Inlet/Outlet Unions - The EP unit comes with union nuts installed on the housing. Packed
with your EP unit are the remaining components necessary to complete the Inlet/Outlet unions. The clear
union tail piece is used on the top union, and the solid color union tail piece is used on the bottom union. Also
packed with your EP unit are two white gaskets that are used to complete the Inlet/Outlet unions. One side
of the gasket is flat, the other side has a half round bead on the face. The two unions each have a groove in the
face of the union tail piece and that groove accepts the half round bead of the gasket to hold the gasket in
place correctly. Place the gaskets into the face of the union tail pieces. Now, install the union tail pieces by
screwing them into the union nuts on the EP unit. DO NOT OVERTIGHTEN. Hand tightening is sufficient.
OVERTIGHTENING WILL BREAK THE UNION NUTS.
5.4 Installing Pressure Gauge - Your EP unit also comes with a pressure gauge that is used to confirm that
your pump is not exceeding the 40 PSI maximum working pressure for the EP UV unit. The pressure gauge
is shipped with Teflon sealing tape on the gauge threads. To install the pressure gauge, you screw it into the
threaded tap on the clear union tail piece that you have installed on the EP unit. If the EP unit is installed
indoors, the pressure gauge can be installed so it is facing upward. However, if the EP unit is installed
outdoors, the pressure gauge must be installed on one side or the other of the clear tailpiece so that it will be
in a vertical position when installed. Installing the gauge facing upwardly when the EP unit is outdoors will
result in the gauge filling full of rainwater and will ruin the gauge. The gauge location and orientation that you
choose is dependent upon which side of the fitting provides the best viewing of the gauge dial.
Be sure to use a wrench to tighten the pressure gauge into the clear tail piece, using the square brass boss
on the back of the pressure gauge. DO NOT OVERTIGHTEN. Over tightening will cause the clear plastic
union tail piece to crack. Three or four threads are all that is necessary to seal the pressure gauge. If the
gauge leaks upon start-up, simply tighten one more rotation. DO NOT TIGHTEN BY GRASPING THE COVER
OF THE PRESSURE GAUGE. Only use the square brass boss on the back of the pressure gauge for
tightening with a wrench.
5.5 Mounting The UV Unit On A Solid Base - The next step is to secure the EP unit to a concrete or wood
base. Four mounting holes are located in the mounting base of the EP unit. These holes accommodate ¼
inch diameter bolts to mount the EP unit in place . FAILURE TO PROPERLY SECURE THE UNIT MAY
CAUSE NOISE DUE TO VIBRATION CAUSED BY WATER PASSING THROUGH THE WET CHAMBER.
Secure the EP unit using bolts and anchors where necessary and appropriate for your installation. (not
supplied) When the EP unit is secured in position, the piping of the unit can begin.
7
Vista de página 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 19 20

Comentários a estes Manuais

Sem comentários